On the 29th of September 2009 we went to Mr Van Ransberg's house as we were told to go and fix his roofing.During the process of our work, we concluded by doing maintenance around the house.The task was done along with Mr Lebese where I have learned that everywhere you go proper maintenance should be done at all times
Today the 30th we went to Sehoale to dig up a trench because a live cable was lying around which was a hazard to the community.I have learned that in every environment everyone should take safety into consideration
Wednesday, September 30, 2009
Tuesday, September 29, 2009
Rewiring :25/09/2009
It was Friday morning where we were told to go and rewire the infra red light at wild life centre clinic.Before performing the given task,we had to do proper planning ensuring that we have all the required materials.We did the measurement on how the trunking should be mounted according to our planning.The task given to us was done under the supervision of Etean.In conclusion I have leaned that through planning,dedication and team work we can achieve better.
Friday, September 18, 2009
Designing:18/09/2009
Today we started by looking for the old iron sheet in our scrap yard.Our purpose was to use them to design the stand for posters.The job was not easy because we had to do the grinding,cutting,measuring and the welding.In conclusion I have learned that through multi- skills,you can save a lot by doing things from old materials.
Wiring:15/09/2009
It was tuesday morning,we left to town where we mounted the skirtins to pull wires through it and installed red plugs.Our task was easier because Etean who was our manager for the day did the planning before we could perform the task at hand.After job completion I have learned that through communication,undrstanding and planning we can make the dufficult tasks simpler.
Thursday, September 17, 2009
Assessment:09/09/2009-11/09/2009
Wednesday to friday
We started with our assessment on Wednesday.As we were told to prepare ourselves,it was easier for us because Mr R.S Hagemann did everything as planned.During the assessment I taught myself that without proper studying you wont make it through the assessment.I have learnt that through dedication and hard work the impossible becomes possible.
We started with our assessment on Wednesday.As we were told to prepare ourselves,it was easier for us because Mr R.S Hagemann did everything as planned.During the assessment I taught myself that without proper studying you wont make it through the assessment.I have learnt that through dedication and hard work the impossible becomes possible.
Subscribe to:
Posts (Atom)