Tuesday, June 30, 2009
Assessmeent continues:30/06/2009
Tuesday morning our assessors came to continue with our assessment and everything went well as planned.We managed to complete 3 modules bringing them to a total of 7 modules.
Assessment:29/06/2009
Monday morning Mr P. Nolte accompanied by Mr R .S Hagemann arrived in our classroom ready to assess us on 3 modules including a new one known as Construct Basic Electronic Circuit.Assessment went absolutely great except the Basic Electronic module which needs proper attention for re-assessment.
Preparation for assessment:25/06/2009
It was Thursday where our facilitator informed us that the date for assessment has been postponed to the 29 of June 2009.Ufortunately it was not easy for me because I could not make time to study.
Monday, June 22, 2009
Preparations for assessment:22/06/2009
On the 21 of J une 2009 I was restless studying for the coming assessment with our new assessor Mr P Nolte coming along with Mr R.S Hagemann.Unfortunaetely they could not come due to other prioprities,but what is good about it is that I tried to study some of the modules though it was not that simple.
Friday, June 19, 2009
Cable joint:19/06/2009
Friday morning around 10:30 am we cut off the cable supplying the pump motor because it was burnt out.We did managed to replace the damage one and join it using MX 2 but not connecting it to the motor due to the drying of the resin.
Thursday, June 18, 2009
Presentations :18/06/2009
Thursday morning we did some touch ups in completion of activity 3 and preparations for our presentation.At around 09:30 our facilitator came marking the activity and giving us an equal opportunity to share everything we did research on.Further more we planned how our schedule is going to be next week Tuesday because during Mondays and Fridays we do practicals around Sondela(electrical maintenance).
Wednesday, June 17, 2009
Activities:17/06/2009
We did activity 3 as planned with our facilitator.We also agreed to do research using internet on the new given task concerning presentations on Thursday.
Friday, June 12, 2009
Electrical maintenance:12/06/2009
We replaced fuorescent tubes (75watts) and their ballast to make sure that they glow.During the maintenance process we also managed to create a new stand to mount an additional fluorescent light controlled by a single lever.
Thursday, June 11, 2009
Assignment :11/06/2009
Wednesday morning I completed the given assignment based on the fundamentals.Later on before 12am i submitted it to Heidi our facilitator while doing research about our next activity.
Wiring
On the 10th of June 2009 I wired a sub DB and installed a fluorescent light together with an ordinary bio net fitting.Further more we continued to connect the double plugs.later on we connected the supply to our sub DB supplied from a transformer over a distance of approximately 1km.Since it was a long distance,we did some test (we plugged a grinder) to ensure that there was no drop in voltage and we were very fortunate because there was a slide volt drop (From 228v to 224v).Our mission was accomplished due to our great ideas.